Lake Oswego Interceptor Sewer Advanced American

The Lake Oswego Interceptor Sewer’s buoyant sewer line is a prime example of state-of-the-art design and technology. AAC participated in both main phases of the LOIS Project. As the marine subcontractor on the Lake Down phase, AAC’s work included four design/build packages: a wind and wave anchor system; a free end pipe restraint system; tether bracket stand; and lowering the sewer pipe for barge crossings.

The wind wave anchors and free end restraint system included placing 3.4 million pounds of concrete anchor blocks in precise locations along the length of the lake. This system prevented movement of the buoyant interceptor during the 24-foot lake drawdown. The 15 tether brackets stands were designed and installed to prevent shallower sections of sewer pipe from grounding during the drawdown.

With the lake down and locations exposed, AAC cut and welded 300 pile caps where the interceptor transitions from water to land. AAC installed the pile long, in water, during the previous Lake Full phase. AAC also completed the final interceptor pipe survey and grading at all 428 pipe tethers.

  • Design/build wind and wave anchor package.
  • Design/build tether bracket stands.
  • Design/build pipe end restraints.
  • Design/build lowered sewer pipe for barge crossing.
  • GPS barge navigation and existing structure avoidance.

Did You Know?

PNWRCC offers scholarships for your kids.

The Northwest Carpenters’ Union values education, and offers both our members and their families access to the high quality college education that working members of the Northwest’s middle class deserve. Apply Now

X

Sign up for mobile alerts

Mobile alerts from Northwest Carpenters. Periodic messages. Msg & data rates may apply. Text STOP to 91990 to stop receiving messages. Text HELP to 91990 for more information.
Terms & Conditions